Categories
Blog

How Long Does A Roof Replacement Take?

We all would like housing projects to take as little time as possible to complete. We do not want to worry about problems, or disruptions to our lives, that could arise if a project takes too long to complete. Are you planning to, or need to replace your roof? If so, we are here to help as your Elk Grove Village roofer. Here are the key factors that our roofing team thinks you should consider when starting the project that can impact how long it will take to complete.

  1. The condition of your current roof.
  2. Materials.
  3. Weather conditions.
  4. Housing Size.
  5. Supply chain disruptions.
  6. How the payment is being covered.

new roof replacement completed by professional elk grove village roofer Davis Roofing & Construction

The Condition Of Your Current Roof Matters:

Do you have a hole in your roof? Is it leaking? Is there rot or mold? Are the shingles curling? These are just a few situations that will need to be factored in when determining the time for replacing your roof. If there is major damage to the roof, like a big hole, it can take longer and may even require work to repair structural damage to the roofing supports as well.

On the other hand, if your roof is in great condition, you may find that you don’t need to remove the current shingles and just install a new layer over the top of your existing roof. Depending on roof size and crew, this could take as little as a day to complete. This is why is it important to meet with your roofing company and allow them to inspect your roof before they can determine a timetable.

What Materials You Use On Your Roof Is Important:

Your roof adds a lot of character to your house. Depending where you live, you may have options of what materials you want installed on your roof. These can impact not only the look of your house, but they also will have different life expectancies, effectiveness, and costs.

Here are some common roofing materials used:

  • Asphalt Shingles: The most common roof material and often takes 1 – 2 days to replace.
    (Learn More about the different types of roofing shingles).
  • Flat Roof: Not as common in residential homes, a flat roof should take 2 – 3 days depending on size.
  • Wood Shakes: A roof replacement typically take 3 – 4 days to replace.
  • Steel Sheets: Normally you can expect around 3 – 4 days to complete
  • Synthetic Slate: A Synthetic option which can be installed in around 3 – 5 days.
  • Natural Slate: A full replacement can take about 6 – 7 days.
  • Concrete Tile: A more involved roof installation that takes about 8-9 days.

Weather Will Always Need To Be Factored In When Planning A Roofing Replacement:

If you are planning any exterior construction project, you have to factor in weather conditions. Every region of the country has its own unique challenges. For example, Elk Grove Village IL roofing project, will face the seasonal challenges found in northern Illinois. Winter is a harsh season to tackle a project like roofing services due to snow accumulation, ice, and extreme cold. As such, this may not allow for some materials to respond right when installing. In the spring and fall you can run into delays caused by rain and thunderstorms.

Challenges with Summer Weather

Summertime can bring extreme heat, which will slow workers, and can also have in impact on your materials as well. If you are in the Elk Grove Village, IL area and want to plan your roofing replacement, the experts at Davis Roofing can help you plan around the weather to ensure your roof is ready for any condition.

How Much Roof Do You Need Replaced?

When you are planning your replacement, understanding how many square footage of roofing will need to be replaced is crucial to determine how long it will take. A standard asphalt roof should take 1 to 2 days to complete if:

  • You have the typical house of 1600 to 1700 square feet.
  • There are no major repairs or inclement weather.

It should go without saying, but if you have a larger house, you will typically find that it will take longer to complete.

Supply Chain Disruptions Can Impact Time:

Before 2020, the supply chain was often an afterthought for most people, but now most people understand that it can impact just about everything. While your roofing job should not start if all the supplies are not available at the start of the job, situations can arise which may rely on additional supplies need to be provided to the job site. Most companies, Like Davis Roofing, will try to ensure that you do not feel any negative impacts of potential shipping delays.

How You Fund Your Project Can Impact The Time Of The Project:

If you are paying for your replacement yourself, the process is straight forward. You will just need to set up the payment plan with your roofing contractor, and they will provide the work accordingly. Delays can come in if you need to bring in a warranty or insurance servicer. While most of these providers will work with you and your contractor to avoid delays, there are often approval processes negotiations that need to take place. It is important to understand what they cover and how they cover so you can avoid delays by not expecting anything that is outside the scope of your coverage.

What Do You Need To Do To Plan Your Roof Replacement?

Schedule a meeting with a roofing company, like Davis Roofing Companies, to inspect and determine the scope of the project.

Work with their team to determine the best materials and design of the new roof.

Have them draft a contract for the work.

Review and agree to the contract.

Schedule the work and start the project.

Before agreeing to the completion of the meet with the contractor to review and inspect the completed work, and if needed have them make any necessary corrections.

Enjoy your new roof!